CONSTRUCTION PROCESS
Home
Ezy Homes News
Home Designs
Photo Gallery
Pricing, Inclusions, FAQ's
Construction Process
Client Testimonials
Owner/Builder Information
Owner/Builder Finance
Builders / Developers
Request More Information
About Ezy Homes
      
CONTACT US
Ezy Homes Australia Pty Ltd
Steel Pole Kit Homes Specialist
Licensed Building Designer
54 York St - PO Box 175
 BEENLEIGH 4207
ph
(07) 3807 0937
fax (07) 3382 6339
     
info@ezyhomes.com.au

 
USEFUL LINKS


H.I.A. Trade Locator
 

Owner/Builder Discount Card
 
 
 
 
KIT HOME CONSTRUCTION PROCESS - FAST & EZY
That's the Ezy Homes Advantage!

From our deep consultive process, we individually draft your house plans for submission to your local council.

Once the plans are approved, your building site is surveyed and an Engineer will mark the footing locations.

The footings are dug & poured, and the height (RL's) of each footing recorded.

Ezy Homes then computer engineer and custom manufacture the required building components, to suit your site.

About four weeks later, your steel frame components are delivered - and you are ready to go!
 
As shown below, an Ezy Home can be erected in just over 1 week - and built to lock-up stage in an incredible 3-4 weeks.
SITE PREPARATION
Your site is surveyed and the footings are poured.  The house components can now be custom manufactured to suit your land - which takes about 4 weeks once the footings are poured.
Day 1: FRAME ERECTION
A crane is used to erect an entire steel frame - in just one day!  Because the kit is pre-engineered & pre-drilled, the components simply bolt together.
Not all homes require a crane to erect.
Week 1: FLOORS & ROOF
The flooring and hardwood decking are laid now, and any sub floor bracing is installed.  The roof frame is constructed, which also simply bolts together.
Week 1: FRAME KIT STAGE
Roof sheeting is laid. Along with the roof insulation, gutters & flashings are also installed now.
The frame kit is now complete.  
Week 2: WALL FRAMING
The wall frames are built (timber is standard, steel wall frames are an optional extra).  The doors and windows are fitted and the building is wrapped in sarking - ready to clad.
Week 3-4: CLADDING
It’s your choice - Colourbond, Hardi sheet, weatherboard, rendered finish - or a combination of cladding can be used.  Use your imagination to create your own unique home.
LOCK-UP STAGE
Now complete to lock-up stage, the home is ready for external finishing & internal fit-out.  This is when your electrical & plumbing work is done.
INTERNAL FITOUT
Now the house really takes shape.  Flexible floor plans enable you to transform our plans into YOUR home.
EXTERNAL FINISHING
The home stretch!
Painting, balustrades, landscaping, & your personal touches - here you can DIY and save $$.
View the Construction Photo Gallery
(view as a slideshow to watch houses being built)
 
Want to know more?

 
email or phone - we'd be happy to answer your questions - click here to Request More Information
  
  